13.8kV Switch Replacement and Relocation
SCOPE OF WORK
Replacement of three 13.8kV gang operated switches
Strategic relocation to opposite side of station
Installation of 600-meter HV cable run
System tie-in to three existing transformers
Hi-pot testing, rotation checks, and transformer repairs
PROJECT HIGHLIGHTS
Under 6 Hours:
Switch replacement, relocation, cabling, system tie-ins, and testing
Improved Safety:
Switches relocated away from traffic areas
Complete Solution:
New switches, 600m cable run, and transformer testing
Project Details
Download Line Card
Completed:
2023
Value:
$5,000,000
Equipment:
3 Gang Operated Switches
Cable Run:
600 meters
Transmission Voltage:
13.8kV
Total Outage:
Under 6 hours
Location:
Thompson
Sector:
Heavy Industrial
Engineer:
Amps Services
Project Manager:
Ron Nault
Contractor:
Amps Powerline Inc.