13.8kV Switch Replacement and Relocation

SCOPE OF WORK
  • Replacement of three 13.8kV gang operated switches
  • Strategic relocation to opposite side of station
  • Installation of 600-meter HV cable run
  • System tie-in to three existing transformers
  • Hi-pot testing, rotation checks, and transformer repairs
PROJECT HIGHLIGHTS
  • Under 6 Hours: Switch replacement, relocation, cabling, system tie-ins, and testing
  • Improved Safety: Switches relocated away from traffic areas
  • Complete Solution: New switches, 600m cable run, and transformer testing

Project Details

Completed: 2023
Value: $5,000,000
Equipment: 3 Gang Operated Switches
Cable Run: 600 meters
Transmission Voltage: 13.8kV
Total Outage: Under 6 hours
Location: Thompson
Sector: Heavy Industrial
Engineer:

Amps Services

Project Manager:

Ron Nault

Contractor:

Amps Powerline Inc.

Project Gallery